What did Loksatta do till now?

with 7 comments

JP is the lone MLA from Loksatta, elected from Kukatpally. The party has formulated a clear plan to develop the constituency by identifying the problems, fixing a definite time-frame to solve these problems and tracking the results. The activities of the party in these four months (June 1, 2009 to Sep 30, 2009):

Update:

Brief Translation: The problems in the constituency have been classified into several categories:

  • depending on the estimated time it would take to solve them: solvable in 3 months, 1 year or 5 years.
  • depending on the scope of the problem: state-wide issues, constitution-related issues, deficiencies related to the laws and Govt. policies, injustice from the Govt.

These issues have been tackled by taking up the solutions with the various levels of the Govt. and trying reforms by proposing appropriate policy changes where necessary.

Actions taken in Kukatpally till now (June 1 – Sep 30, 2009: 4 months):

Completed Actions:

  1. Dr. JP conducted 4 face to face programs with people (at IMAX garden no. 4) to know the problems faced by the people and took appropriate actions.
  2. Took 99 samples of drinking water and showed to the water-board authorities, that the chlorine levels are not appropriate and directed them to take actions.
  3. Free eye and thyroid test-drives have been conducted.
  4. Free Health-care center is organized and medicines are provided in Balanagar with the help of two doctors.
  5. The construction of the under rail bridge in Safdarnagar, which has been neglected for several months has been completed.
  6. 20 new borewells in the Kukatpally area colonies, where people did not have access to daily water supply.
  7. 95% of the pipeline construction from Vasantnagar to Bhagat Singh nagar, to regulate drainage problems in the rainy season, has been completed.
  8. Booster pumps in Satyanarayana Swamy colony, Parvatnagar, Motinagar divisions to complement the irregular drinking water-supply that has been there for several years.
  9. Street lights between Vasant nagar and Satyanarayana colonies.

JP is available in the constituency every Saturday for discussing the problems and issues faced by the people.

Actions in progress:

  1. Underground drainage system: Works worth Rs. 4.4 crore have been started in 11 colonies/bastis. This helps nearly 2 lakh people, and prevents the mixing of sewage and water supply. Will be completed by Dec 31, 2009.
  2. 300 mm pipeline construction in Moosapet division for Manjeera water supply. Another 400 mm pipeline construction to make use of the neglected overhead tank.
  3. Road construction work has been started in Kukatpally ninth phase.
  4. Arrangements have been made to restart the swimming pool, indoor stadium construction in Kukatpally sixth phase.
  5. Started the road-widening work in Kukatpally phase road number 1.
  6. Started the system of Citizen Help Centers for the people to solve the municipality and Govt. related problems.
  7. Kukatpally circle receives only 9 mgd water (5% of the city) even though it has 56000 water connections (10% of the city). Arrangements have been proposed to supply atleast 16 mgd water. Work is in progress.

Proposals submitted to the Govt.:

  1. To construct four foot-over bridges for pedestrians in JNTU, Balanagar, Kukatpally, Moosapet areas.
  2. To move HUDA truck park from Kukatpally to Miapur and construct an auditorium for cultural and entertainment programs and a commercial center in its place.
  3. To have 3 sulabh complexes in areas with high population densities.
  4. The messy drinking water-supply situation in Kukatpally has been reformed to a certain extent. Proposals have been sent for full-fledged reformation.
  5. To construct 6 sewerage treatment plants near ponds/lakes and to fence the ponds/lakes to prevent illegal occupation.
  6. To build service roads from Moosapet Y-junction to Miapur to reduce traffic congestion on NH-9.

Share

Advertisements

Written by jujung

October 25, 2009 at 6:41 AM

Posted in Agenda, Loksatta, Telugu

Tagged with , , ,

7 Responses

Subscribe to comments with RSS.

  1. hey dude..

    can you pls translate it.

    If not the whole thing.. atleast a rough summary. Thanks.

    sc

    November 11, 2009 at 12:12 PM

    • Added the translation.

      jujung

      November 13, 2009 at 10:07 AM

  2. You forgot to include introduced bills, votes, motions and opinions in assembly

    Prasanna

    November 19, 2009 at 5:48 PM

    • This post mainly deals with the party activities in Kukatpally. Policy advocacy by Loksatta has been left out of this post. There are other posts which dealt with these issues. I think common people are primarily motivated by what they see on the ground than what is happening in the legislatures.

      jujung

      November 19, 2009 at 6:16 PM

  3. […] This post was mentioned on Twitter by Yossarin Offstumped and Prasanna, Loksatta Supporter. Loksatta Supporter said: Much needed english translation RT @mlpkr: What Loksatta and JP did in Kukatpally http://bit.ly/10gbkt […]

  4. Social comments and analytics for this post…

    This post was mentioned on Twitter by mlpkr: What Loksatta and JP did in Kukatpally https://lspjunction.wordpress.com/2009/10/25/what-did-loksatta-do-till-now/

    uberVU - social comments

    November 20, 2009 at 12:49 AM


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: